Package No. 3
Package No. 3
EARTHQUAKE –2001 Rehabilitation Package No. 3 For earthquake affected.
Read with :
Revenue Department resolution no.CLS-162001 201(4)-S3 dtd. 7.2.2001
General Administration Department Resolution No. EST - 102001 - 830-KH, dated 8-02-2001.
Minutes of Cabinet Meeting dated 13-02-2001.
Resolution
:
On 26th January, the state of Gujarat
was hit by an earthquake of a magnitude of 6.9 on the Richter scale
according to IMD (US Geological Survey has put the magnitude at 7.7) causing
colossal damage to life and property.
The State Government has taken up the task of rehabilitation and
reconstruction to facilitate resettlement and provision of shelter to the
severely affected population. In order to enable those who were rendered
homeless, the Government intends to assist them to re-build their houses and
provide other infra-structural facilities in the affected areas, with the
active support and co-operation of Industrial Houses, Voluntary
Organizations, Public Sector Enterprises, other State Governments, National
& International Institutions etc.
Government intends to alleviate the hardship of the affected people, and
enable them to reconstruct their houses, through a rehabilitation programme.
The rehabilitation programme is not by way of compensation for loss
undergone, but an earnest effort to provide succour and assistance.
The rehabilitation programme has been
evolved, in the form of four different packages by the Gujarat State
Disaster Management Authority based on the recommendations of the Task
force. The same was submitted to the State Cabinet for its approval. The
Cabinet after full deliberation and due consideration has approved the
packages.The details of the Package No. 3 is as under :-
Package No. 3
For area other than zone 4,5 & other worst affected areas.
The
scale of assistance will be as under :-
Totally / partially damaged huts :
|
Sr. No. |
Category |
Assistance |
|
1. |
Completely destroyed hut |
Rs.7,000/- |
|
2. |
Partially damaged hut |
Rs.2,000/- |
Completely
destroyed / partially damaged houses :
|
Sr. No. |
Category |
Assistance |
|
1. |
If there are crack/cracks of atleast ½ inch width |
Upto Rs. 2,000/- |
|
2. |
For repair of damage up to 10% |
Upto Rs. 5,000/- |
|
3. |
For repair of damage up to 25%. |
Upto Rs. 10,000/- |
|
4. |
For repair of damage up to 50% |
Upto Rs. 20,000/- |
|
5. |
Completely damaged kacha / pakka house. |
Upto Rs. 40,000/- |
The completely destroyed house/hut means totally collapsed house and house/hut required to be pulled down for safety reasons.
The
assistance will be disbursed to owner/actual possessor of
the property.
In
case where the dwelling unit occupied by a tenant(as
provided under Bombay Rent Control Act.) has collapsed or has been pulled
down for safety reason, the landlord of the house will be given assistance
subject to the condition of putting back the tenant in possession soon after
the reconstruction of the house.In case of repair, assistance will be
disbursed to the tenant for carrying out the repair.
In
case such residential building was being utilized
for any nonresidential purpose, no assistance shall be given to the owner
occupier of such house.
The affected beneficiaries will be allowed to rebuild houses at the existing site. The Government will provide technical guidance, provide material specifications for building earthquake resistance building. The State Government will provide technical supervision.
The
damage assessment will be carried by a team comprising
of a government engineer, an official of Revenue/Panchayat and a
representative of NGO/Headmaster if NGO is not working in village. The team
in addition to filling up the sheet, shall also draw Panchnama. Photographs
of each damaged house will be taken by the Survey Team for which
Photographer will be engaged as per prevailing provisions.
The
survey form alongwith application of beneficiary will be filled up by the
survey team and the signature of the affected beneficiary will be taken with
an undertaking that in case of any particular in the application is found
false, the entire assistance will be surrendered.
The
survey form & other documents duly completed with the
clear opinion of Survey team on extent of damage and quantum of assistance
will be deposited with the Additional Collector/Collector who shall
scrutinize and release payment.
The
measurement of built up area excludes Varandah and
other peripheral structures. The measurement of built up area will be
conducted by the Survey Team and opinion of the team will be treated as
final.
All
the building regulations and by-laws of appropriate
authority, and earthquake standards & norms have to be
strictly followed.
The
assistance will be disbursed at different stages of
construction in three installments. 40% of the assistance will be disbursed
at preparatory level, 40% at the stage of lintel level of the construction
and 20% after the completion of the construction. The last payment will be
made on production of completion certificate.
All payments shall be disbursed by account payee cheques only. Collector/DDO/Addl.Collector/Addl.DDO shall make appropriate administrative arrangement for quick disbursement.
The
interpretation of any terms and conditions, regulations and category of
assistance and damages shall lie with the State Government and the
interpretations and decisions of the State Government shall be considered as
final.
All
the expenditure will be booked under the major head : 2245-Natural
Calamities and Relief, Major head: (2) Flood and Cyclone.
This
resolution is issued with the concurrence of Finance Deptt. vide
……………………………………………………………………………
Dated………..
By order and in the name of the Governor of Gujarat.
S.N.Dave
Jt Secretary to the Government.of Gujarat
Revenue Department.